Dear Customers,
During the evening of Friday, October 24, starting at about 9:00 PM Pacific (Saturday, October 25 at 5:00 AM GMT), we will be performing maintenance on some of the servers used for the MAX Mail control panel. As a result, the MAX Mail control panel will be offline for approximately 30 to 60 minutes.
During the maintenance window, no configuration changes will be possible. Mail flow will not be impacted.
Thank you for your attention.