Planned maintenance for MAX Mail control panel

We are planning a hardware migration for database systems used by the MAX Mail control panel.  This work will require a 1-hour maintenance window on Saturday, February 23 beginning at 10 PM Pacific time, and a follow-up maintenance window on Saturday, March 2 at the same time.

During these periods, the control panel will be offline.  While we are scheduling a maintenance window of one hour, the expected downtime for the control panel will be approximately 15 minutes during that window.

Mail flow will not be affected by this maintenance work.

Thanks for your attention.

This entry was posted in Mail Assure. Bookmark the permalink.