Planned maintenance for MAX Mail control panel

We will be performing an update on the primary database systems used for the control panel this Friday evening.  As part of this process, we are scheduling a planned maintenance window for the control panel for Friday, May 11, beginning at roughly 9 PM Pacific / 12:00am Eastern / 5:am GMT.  We expect the control panel to be off-line for approximately 20 minutes or less.

Message processing should not be affected during this window.

Please accept our apologies for any inconvenience.

This entry was posted in Mail Assure. Bookmark the permalink.